Commercial MEP and Technology Consulting and Design in Central London

Coordinated mechanical, electrical, lighting, network, audiovisual and control-system design for offices, hotels, restaurants and retail: one design package, developed with your architect, your landlord and your fit-out team.

Coordinated design • Clear tender information •  Central London projects

On this page+

One coordinated MEP and technology design for commercial space that has to earn its keep. AVC Integrations is a design-led building-services consultancy for offices, hotels, restaurants and retail across Central London: mechanical, electrical, lighting, networks, audiovisual, security coordination and building controls, designed as one package.

Why coordination matters

A fit-out is a business decision before it is an engineering one

A commercial project is judged on three things: the programme, the cost and the environment it hands over. Every building service bears on all three. Air conditioning shapes ceilings, riser space and landlord negotiations. Ventilation needs ducts, fresh-air routes and acoustic care. Lighting drives circuits, controls and ceiling coordination, and emergency lighting has statutory obligations attached. Data networks, structured cabling, audiovisual systems, access control and building controls each add their own cabling, equipment rooms, power and cooling, all of it fighting for ceiling voids and riser space the base build never has enough of.

When each of those systems is procured on its own, or brought in after the design is fixed, the project pays for it twice. First in the tender, where quotations built on different assumptions cannot be compared and the gaps between packages go unpriced. Then on site, where ceilings refuse to close, change orders erode the contingency, and the programme slips while the trades argue over space nobody coordinated on a drawing.

Appointing one team to lead and coordinate the whole building-services package changes that arithmetic. Every discipline is designed against the same architectural information, the same landlord constraints and the same programme, so conflicts surface on drawings, where they cost a revision, rather than on site, where they cost money and weeks. The commercial results are concrete: comparable pricing, fewer change orders, greater programme certainty and a finished environment that supports the business. This page describes the commercial service; the practice behind it is set out on our design consultancy page.

The complete package

One coordinated building-services and technology package

Every discipline below can form part of a single coordinated design: each developed with the others, and all of them developed around the architecture, the base building, the operation of the business and the practicalities of construction and maintenance:

Mechanical

air conditioning, heating and ventilation for working spaces

Electrical

power and distribution sized for the way the business runs

General & emergency lighting

light for work and hospitality, with escape lighting designed in

Lighting control

scenes, zoning and daylight response, kept simple to operate

Data networks & Wi-Fi

coverage and capacity the business actually depends on

Structured cabling

the low-voltage backbone behind every other system

Audiovisual

meeting rooms, presentation spaces and background audio

Security & access

access control, CCTV and intruder systems, coordinated

BMS & automation

monitoring and control of plant, energy and comfort

Public health

hot and cold water and drainage, where included

Architecture & interiors

the intent every system must serve

Construction & maintenance

buildable, accessible, serviceable

One design · one coordination · one point of responsibility

Some disciplines we design directly; others we lead and coordinate alongside specialist designers and suppliers, the appointment defines who produces what, and the result is always a single coordinated package. No discipline is automatically included: the agreed scope defines the design.

Mechanical design · Air conditioning & ventilation

Comfort that survives full occupancy

The mechanical package spans heating, cooling and air conditioning, fresh-air supply, extract ventilation and heat recovery where the building supports it. Designing those systems properly means resolving what surrounds them just as carefully: plant positions and heat rejection, duct and pipework routing, condensate drainage, zoning and controls, acoustic treatment, and the maintenance access that keeps the installation serviceable for its whole life.

In commercial buildings the hard questions are rarely about the equipment itself. Where can condensers actually go when the roof, the lightwells and the landlord's plant areas are all spoken for? Does the base building have the cooling and fresh-air capacity the new layout demands, and if not, what is the honest way to bridge the gap? How do diffusers sit in a feature ceiling? How is a restaurant's kitchen extract routed, and how is it kept out of the neighbours' windows? We answer those questions on drawings, coordinated with the structure, the interiors and the landlord's requirements, kitchen-extract systems developed with the specialist kitchen designer where one is appointed.

The systems themselves, equipment selection, zoning strategies and the trade-offs between them, are covered in more depth on our commercial air conditioning & ventilation page.

Electrical design & power distribution

Power distribution the business can grow into

The electrical design is the quiet backbone of commercial premises. Our scope covers supply and capacity assessment against the landlord's provision, main and sub-distribution with a clear distribution-board strategy, general and small power for desks, meeting rooms, teapoints and front-of-house areas, dedicated supplies for kitchens, comms rooms and plant, sub-metering so energy use can actually be seen, containment routes, earthing and surge protection, and the power that lighting, mechanical, AV, security and network systems all depend on.

We design spare capacity in the honest sense: appropriate headroom in distribution, containment and cabling routes for reasonably foreseeable change, another row of desks, a new teapoint, a meeting room that becomes two, without promising to predict every technology that may arrive. Wiring layouts, circuit schedules and distribution-board schedules form part of the tender information, so contractors price the same installation. The full electrical scope has its own page: commercial electrical services.

General & emergency lighting · Lighting control

Lighting for work, hospitality and the escape route

Commercial lighting has to do several jobs at once. In workplaces it must be comfortable for screen-based work, coordinated with the ceiling and honest about glare. In hospitality it is the atmosphere; a restaurant at lunch and the same room at ten in the evening are two different lighting designs sharing one ceiling. We design the general lighting, the accent and architectural layers, and the control strategy that binds them: zoning, scenes, occupancy response, daylight dimming and time schedules, kept simple enough that staff actually use them.

Emergency lighting is designed into the same layouts from the start: escape routes, open areas and exits covered, fittings positioned to the relevant standards and documented so the completed installation can be tested and maintained. Treated as an afterthought, emergency lighting punctures finished ceilings; designed alongside the general lighting, it disappears into them.

Where daylight, glare or solar gain call for it, automated shading is designed with the lighting rather than after it. Both subjects are covered in depth on our commercial lighting & shading page.

Data networks, Wi-Fi & structured cabling

The infrastructure every other system stands on

Most businesses notice their network only when it fails, usually in the first week in the new space. We design the data network and Wi-Fi around how the premises will actually be used: coverage and capacity for the working areas, guest access where hospitality demands it, and wired connections where reliability matters more than convenience.

Beneath it sits the structured cabling: the low-voltage backbone that AV, security, building controls and telephony increasingly share. The design covers outlet quantities and positions, cabling routes and containment, comms-room location, layout, power and cooling, patching strategy and the testing and certification expectations written into the tender information. Comms rooms are a classic coordination failure on commercial projects, too small, too hot and too late. Placing them correctly at design stage costs nothing; moving them at fit-out stage rarely does.

Audiovisual & meeting-room technology

Meeting rooms that work on the first call

Video conferencing is now the most heavily used technology in most offices, and the most complained about. We design and coordinate meeting-room AV and video-conferencing systems, boardrooms, presentation and town-hall spaces, background audio for hospitality and retail, and digital displays, displays, cameras and microphones positioned for the room rather than the brochure, equipment locations with power and cooling, structured cabling and containment, and acoustics considered before the glass partitions are ordered.

Because the AV is designed alongside the mechanical and electrical services, its power, data and ventilation appear on the same coordinated drawings, not as a late instruction to a contractor who has already closed the ceilings. Room-by-room detail, including platform choices, lives on our Teams & Zoom meeting rooms page.

BMS, automation & security coordination

Control and security, designed in proportion

A building management system: the BMS: monitors and controls the plant: heating, cooling, ventilation, metering and alarms, visible from one place instead of a dozen panel doors. We design the controls strategy and the points, interfaces and metering behind it, sized to the building rather than to a product catalogue: a single restaurant needs far less than a multi-floor office, and a system nobody can operate is worse than none. Energy visibility is a first-class requirement, not a bolt-on, sub-metering and sensible trend data give facilities teams the evidence to run the building well. The subject has its own page: commercial BMS & automation.

Security is a coordination discipline on our projects: we coordinate access control, CCTV and intruder-detection requirements with the client's security advisers and the specialist installers: door-hardware interfaces, reader and camera positions, power, data, containment and the interaction with fire-alarm and escape strategies, so the security package lands in the same coordinated drawings as everything else, rather than arriving on site as a surprise.

CAT A, CAT B & the base building

Landlord and base-build coordination, in plain English

Most Central London fit-outs happen inside someone else's building. CAT A is the landlord's base specification, raised floors, ceilings and primary mechanical and electrical services distributed for open-plan use. CAT B is the occupier's fit-out: the partitions, meeting rooms, teapoints and technology that make the space theirs. Between the two sits the work that decides whether a project runs smoothly: connecting to and adapting the base-build systems, checking their capacity against the new layout, and obtaining the landlord's technical approval for the changes.

We handle that interface as part of the design: reviewing the CAT A information and record drawings, testing the proposed layout against the base building's real capacity, designing the adaptations, and preparing drawings and specifications suitable for review by the landlord's consultants and managing agents, then responding to their comments until consent can be given. The same thinking serves landlords in the other direction: we design CAT A and base-build service upgrades that make lettings straightforward, from a single floor in a City of London building to a refurbishment across several.

AutoCAD, Revit & BIM coordination

Resolve the details before the trades meet them

A coordinated design has to reach the contractor as coordinated information, or the coordination never happened. Our packages are produced in AutoCAD and Revit and carried through BIM coordination: MEP layouts, reflected ceiling plans agreed with the architect and interior designer, wiring and containment layouts, plant and riser drawings, equipment schedules, builders' work information, installation details, clash reviews and tender documentation, kept aligned with the design team's information from first issue to construction.

For the people paying for the project, the value shows up in the numbers: spatial conflicts found while they are still drawing revisions, tender returns built on the same assumptions and therefore genuinely comparable, fewer change orders, a protected design intent and a programme with fewer unknowns in it. No consultant can promise a site without surprises; the job of coordination is to make the surprises small, rare and cheap.

Tender, construction & commissioning support

From comparable prices to a clean handover

Tender information is where design quality turns into commercial value. Drawings, equipment schedules, specifications and clear scope descriptions let contractors price the same job, so quotations can be compared line by line, gaps between packages are visible before they are bought, and the cheapest number can be examined rather than simply believed. Where included in the appointment, we review the returned quotations with the project manager or QS and set out the genuine differences.

During construction: again, where the appointment includes it: we answer technical queries, review installation on site, attend progress and coordination meetings, and coordinate commissioning: the structured process of setting systems to work and proving they perform as designed. At handover we define the record information, operating and maintenance documentation and demonstrations the client should receive, so the facilities team inherits a building it can actually run.

Project applications

Designed for the way Central London does business

Office fit-outs

CAT B interiors that connect cleanly to the base build

Office refurbishments

services upgraded floor by floor, often around occupiers

Landlord & CAT A works

base-build services that make lettings straightforward

Hotels

guest comfort front of house, resilient services behind it

Restaurants & bars

atmosphere in the room, hard-working plant out of sight

Retail & showrooms

lighting, climate and technology in service of the offer

Galleries & client suites

closely controlled environments with nothing on show

Workplace relocations

premises assessed and designed before commitments are made

Occupied-building projects

phased, sequenced works that keep the business running

The same coordinated approach serves private houses and apartments; that side of the practice is described on our residential consulting and design page.

Who we work with

One consultancy, six audiences

Owners & occupiers

A workplace that supports the business from day one: comfort, connectivity and technology that behave, delivered without the fit-out consuming the leadership team's year.

Landlords, developers & asset managers

CAT A and base-build design that lets well, clear technical review of occupiers' proposals, and record information that keeps the building manageable between tenancies.

Hotel & restaurant operators

Front-of-house atmosphere and back-of-house reliability: lighting, climate, audio and extract designed for service, with plant kept quiet and out of the guest's experience.

Architects & interior designers

Spatial coordination, Revit and AutoCAD information, ceiling integration and service routes, technical detail that protects the design intent instead of eroding it.

Main & fit-out contractors

Coordinated information, clear scope splits, builders' work, installation details and prompt answers to technical queries, before they become variations.

Project managers, QSs & facilities teams

Comparable tender returns, disciplined change control, commissioning oversight and handover information the estates team can actually operate from.

Design deliverables

What your MEP design package may include

Deliverables are agreed to suit the project scope and stage; the appointment defines exactly what is produced. Depending on that scope, a package may include:

Client design brief

Base-build & CAT A review

MEP design strategy

Mechanical layouts

Electrical layouts

Wiring & containment layouts

General lighting layouts

Emergency lighting layouts

Lighting-control strategy

Data & Wi-Fi strategy

Structured cabling layouts

Audiovisual & meeting-room layouts

Security coordination drawings

BMS points & control descriptions

Public-health layouts

Equipment schedules

Specifications

AutoCAD drawings

Coordinated Revit models

BIM coordination

Reflected ceiling coordination

Plant & riser layouts

Builders' work requirements

Landlord-approval information

Tender information

Contractor quotation review

Installation reviews

Commissioning coordination

Record-information requirements

A simple start

A clear way to start

  1. 01

    Share your project information

    Complete the enquiry form below and send whatever exists today: test fits, lease plans, CAT A drawings, surveys, specifications or photographs of the premises.

  2. 02

    Optional discovery call

    If helpful, we arrange a short Microsoft Teams call to understand the premises, the project stage, the parties involved and the intended scope. Entirely optional.

  3. 03

    Scope and fee proposal

    After reviewing your information we prepare a clear written proposal: recommended scope, deliverables, assumptions and professional fees for the design appointment.

  4. 04

    Survey and design brief

    If appointed, we arrange an appropriate survey of the premises and the base-build services, its extent depends on the stage and the available information, and establish the detailed requirements with you and your team.

  5. 05

    Design and coordination

    We develop the agreed design, coordinate it with the architect's and interior designer's information, and manage the technical dialogue with the landlord's team and specialist suppliers throughout.

  6. 06

    Tender and construction support

    Where included in the appointment, we assist with tendering, contractor review, installation reviews, commissioning coordination and handover.

Start by sharing a few details below. Complete only the fields relevant to your project.

Start the conversation

Tell us about your project

Share as much or as little information as you currently have. If drawings are available, upload them and we can begin by reviewing the project.

Share as much or as little as you currently have, we only need an email address or telephone number to respond. Every other field is optional.

Drawings and documents
Photographs of the premises

Up to 100 MB per file. Files are transferred securely to our project team, are never published anywhere and are used only to review your project.

Your details are used only to respond to your enquiry and are not shared with third parties for marketing, see our privacy policy.

Where we work

MEP design for Central London commercial premises

We provide commercial MEP consultancy across Central London, with much of our work concentrated in:

City of LondonMayfairSohoFitzroviaMaryleboneCovent GardenSt James'sWestminster

We also take on projects in Knightsbridge, Belgravia, Victoria, Holborn and Midtown, Clerkenwell, Shoreditch, King's Cross, Paddington, the South Bank and Canary Wharf. These are areas where we undertake projects; our office is in Croydon, and we work across London and the South East.

Central London brings its own commercial engineering conditions: occupied premises and trading neighbours, landlord consents and base-build constraints, limited riser and plant capacity, roof space already spoken for, noise conditions, planning and heritage constraints, out-of-hours working windows and demanding delivery logistics. A Soho restaurant and a Westminster office share almost none of their requirements, except that in both, much of the value of coordinated MEP design lies in resolving exactly these constraints before they reach site.

Questions, answered

Frequently asked questions

What does a commercial MEP consultant do?+

MEP stands for mechanical, electrical and public health: the building services that make commercial premises work: heating, cooling, ventilation, power, lighting, water and drainage, together with the technology systems modern businesses depend on. A commercial MEP consultant designs those services around the architecture and the way the business operates, coordinates them with one another and with the base building, and produces the drawings, schedules and specifications contractors need to price and build the work accurately. Unlike an installation contractor, a consultant's role is design, coordination and protecting the client's interests, not selling a particular product.

What is included in a commercial MEP design package?+

It depends on the agreed scope, but a complete package typically covers mechanical design (air conditioning, heating and ventilation), electrical design (power and distribution), general and emergency lighting, lighting control, data networks and structured cabling, audiovisual systems, security and access-control coordination, BMS and automation, and public-health design where included, all coordinated in AutoCAD drawings and Revit models with equipment schedules, specifications and tender information. The appointment defines the final deliverables; nothing is included by default that the project does not need.

When should we appoint an MEP designer for an office fit-out?+

Before the space plan is frozen, ideally. Meeting rooms, teapoints, comms rooms and open-plan densities all drive cooling, ventilation, power and cabling, and every service competes for the same ceiling voids and risers. Early appointment means the test fit is checked against what the base building can actually support, landlord conversations start with real information, and the budget reflects the true scope. Appointed late, an MEP designer can only document decisions that have already been made, including the expensive ones.

What is the difference between a CAT A and a CAT B fit-out?+

CAT A is the landlord's base specification, typically raised floors, ceilings and primary mechanical and electrical services distributed for open-plan use. CAT B is the occupier's fit-out: partitions, meeting rooms, teapoints, AV, security and everything else that makes the space theirs. For building services, CAT B means adapting and extending the CAT A systems: moving diffusers, rezoning controls, adding power and cooling where the layout demands it, and demonstrating to the landlord that the base building can support the changes. Our design work covers exactly that interface.

Do we need landlord approval for MEP alterations?+

On leased premises, usually yes: most leases require the landlord's consent to alterations, often formalised through a licence for alterations, and the landlord's technical team will expect drawings and specifications to review. We prepare design information suitable for that review, respond to technical comments and coordinate with the landlord's consultants and managing agents. The formal consent process itself is a matter for your lease and your legal advisers; our role is making sure the technical submission stands up.

Can you work with our architect, interior designer and fit-out contractor?+

Yes; it is how we prefer to work. We treat the architectural and interior-design intent as a constraint to protect, coordinate our information with theirs, attend design-team meetings where useful, and answer contractors' technical queries directly. Much of our role is translating between the design team, the landlord's consultants, specialist suppliers and the contractor, so decisions are made once, on drawings, rather than repeatedly on site.

Can you review a design produced by someone else?+

Yes. We review existing mechanical, electrical or technology designs: including design-and-build contractors' proposals: against the brief, the architecture, the base building and buildability. The review identifies spatial conflicts, missing coordination, unclear scope, gaps between packages and quotations that are not genuinely comparable, and we issue clear comments and mark-ups the team can act on. On some projects that review is the whole appointment; on others it is the start of a larger role.

What tender information do you produce?+

Drawings, equipment schedules, specifications and scope descriptions that let contractors price the same job, which is the point. Vague tender information produces quotations that cannot be compared and disputes that surface later as variations. We define what is in each package, how systems interface, what standards of workmanship and testing are expected and what must be handed over at completion, and, where included in the appointment, we review the returned quotations so the differences between them are visible before a contract is signed.

Do you design meeting-room AV and video conferencing as well as MEP?+

Yes, technology is part of the package, not an afterthought. We design and coordinate meeting-room audiovisual and video-conferencing systems, presentation spaces, background audio and the supporting infrastructure: displays, cameras, microphones, equipment locations, structured cabling, power, cooling and acoustically sensible room layouts. Designing AV alongside the mechanical and electrical services means the power, data and containment are on the same coordinated drawings, so the rooms work on day one rather than being retrofitted after handover.

Do you provide installation as well as design?+

AVC is a design-led consultancy that also delivers and commissions systems on selected projects. Design appointments stand on their own: many clients appoint us for design and coordination only, with installation tendered to specialist contractors, and some disciplines are always delivered by specialist suppliers we coordinate rather than replace. Where delivery is included, it is agreed explicitly in the scope of the appointment.

Can you support phased works in occupied buildings?+

Yes. Much of our commercial work involves premises that stay open while the work happens, offices refurbished floor by floor, restaurants and hotels that cannot simply close. The design reflects that reality: sequencing, temporary services, out-of-hours working, noise-sensitive activities, protection of existing systems and coordination with building management. A phased project needs those decisions made in the design, not improvised on site at the occupier's expense.

How is the design fee determined?+

By scope, not by formula. Send whatever information exists: test fits, lease plans, CAT A drawings, surveys, photographs or simply a description: and after reviewing it, with an optional discovery call, we prepare a written proposal describing the recommended scope, deliverables, assumptions and professional fees. You see exactly what the appointment covers before committing, and the enquiry form on this page accepts secure uploads of PDF, DWG, RVT, IFC and common document formats.

Start with a design the whole team can build from

Whether you are weighing up premises, briefing an architect or already heading towards tender, we can help define and coordinate the mechanical, electrical and technology systems your project needs: one package, one coordination, one point of responsibility.